/ClassInformation/images/programvids/314102.flv

Wood Tech (314102)


A Technical Diploma
Credits required for graduation: 38.00

Expanding construction has placed new demands on the building industry. There is a need for highly skilled people in both carpentry and cabinetmaking.

The Wood Tech program provides the student with the knowledge and skills necessary for job success in the industry. It also teaches a basic knowledge of the other construction trades. Fundamentals of building design, layout operation, cabinet design, CNC applications and materials of industry are taught in the classroom. The use of hand and power tools is developed in the shop. Residential construction techniques are developed at the house site. Related mathematics, blueprint reading, welding and estimating is included in the training.

Graduates have the opportunity for rewarding employment in cabinet shops, construction crews, building supply or lumberyards, and other phases of the construction industry.

Admission Requirements

Western accepts COMPASS, ASSET or ACT –Testing may be waived with applicable post-secondary credits. There is a $20 fee for this assessment (fee subject to change). If you have taken the ACT, ASSET or COMPASS within the last five years, you can request that your scores be submitted to Western. The testing guidelines are:

Assessment AreaACTASSETCOMPASS
Writing164156
Reading163975
Math/Numerical/Pre-Algebra183938

Curriculum

Catalog Nbr. Course Name Credits Estimated Tuition
First Semester
31409314 Cabinet & Furniture Making 1 3.00 345.30
31409315 Cabinet & Furniture Making 2 3.00 345.30
31410319 Blueprint Reading I 1.00 N/A
31410356 Fund Building Const 1 3.00 N/A
31410357 Fund Building Const 2 3.00 N/A
31804310 Applied Math 1 - Industrial 1.00 112.60
31804316 Applied Math 2 - Wood 1.00 N/A
10606198 Auto CAD Basics 1.00 115.10
Estimated Total 16.00 918.30
Second Semester
31410302 Bldg Trades Essentials 1.00 112.60
31410329 Blueprint Reading II 1.00 112.60
31410339 Blueprint Rdng III-Bldng Trade 1.00 112.60
31410366 Framing Tech Wood Const 1 3.00 374.55
31410367 Framing Tech Wood Const 2 3.00 374.55
31410376 Interior Trim Wood Const 1 3.00 374.55
31410368 Exterior Trim 3.00 374.55
Estimated Total 15.00 1836.00
Third Semester
31410338 Estimating Bids & Specs 1.00 112.60
31410377 Interior Trim Wood Const 2 3.00 374.55
31410386 Fund Building Const 3 3.00 374.55
Estimated Total 7.00 861.70